Standard turnaround — 5 working daysDrop-off point arranged with youENNLFR
Surfery RepairRepairRequest a repair
KitesBars & linesBoardsHydrofoilsHarnessesBags
The work

Real jobs, real gear.

Photographs from the bench. Kites, boards, foils, and the parts that fail in transit.

Canopy laid out flat for panel replacement
Kite
Canopy laid out flat for panel replacement
Leading edge torn open at the valve, taped over to get off the water
Kite
Leading edge torn open at the valve, taped over to get off the water
Strut and centre line, inflated for pressure test
Kite
Strut and centre line, inflated for pressure test
Valve seat and insert ready for refit
Kite
Valve seat and insert ready for refit
Rail masked ahead of a carbon patch
Board
Rail masked ahead of a carbon patch
Compressed heel dent, ground back to sound laminate
Board
Compressed heel dent, ground back to sound laminate
Nose impact damage, filled and faired
Board
Nose impact damage, filled and faired
Insert channels cleaned and re-threaded
Board
Insert channels cleaned and re-threaded
Foil board back from rail and finish work
Board
Foil board back from rail and finish work
Board bag zip and slider replacement
Bag
Board bag zip and slider replacement
Rolls of ripstop and Dacron on the workshop shelf
Workshop
Foil Drive electric drive unit opened on the bench
Workshop
Canopy panels cut and laid out for replacement
Kite
Canopy panels cut and laid out for replacement
Ripstop stock matched to the canopy before cutting
Kite
Ripstop stock matched to the canopy before cutting
Replacement bladder inflated and leak-checked
Kite
Replacement bladder inflated and leak-checked
Strut and centre seam after rebuild
Kite
Strut and centre seam after rebuild
Mast fitting retapped and cleaned up in the vice
Foil
Mast fitting retapped and cleaned up in the vice
Fin box cut out ahead of replacement
Board
Fin box cut out ahead of replacement
Twin-tip in for deck and insert work
Board
Twin-tip in for deck and insert work
Walking-foot sewing machine set up for Dacron
Workshop
Heat welding station at temperature for Aluula composite
Workshop
Repair tools and marine thread laid out on the bench
Workshop
Vacuum infusion table ready for a carbon layup
Workshop
Kite bar and line set hung up for measuring
Workshop
Carbon cloth and epoxy stock in the workshop
Workshop
Recent jobs

What came through the door.

04 Aug 2026
Duotone Rebel SLS 12m
Kite

Leading edge blown open beside the inflate valve and taped shut on the beach. Damaged section cut out, Dacron replaced, valve seat rebuilt, held overnight at riding pressure.

4 days
+
29 Jul 2026
North Orbit 9m
Kite

Two tears through the trailing edge panel after a beach loop. Full panel replaced in matched ripstop rather than patched.

3 days
+
24 Jul 2026
Appletree Noseless 5'2"
Board

Heel compression through the deck laminate. Ground back to sound laminate, carbon patch infused under vacuum, faired and finished.

6 days
+
18 Jul 2026
Armstrong 85cm mast
Foil

Impact damage at the fuselage joint. Layup repair, threads retapped, alignment measured against the reference before return.

5 days
+
11 Jul 2026
Core XR8 10m
Kite

Bladder failure at the valve seat. Bladder replaced, valve seat rebuilt, leak-checked overnight at riding pressure.

2 days
+
03 Jul 2026
Mystic Majestic X
Harness

Spreader bar webbing worn through at both load points. Webbing renewed and load points restitched, tested above working load.

2 days
+

Free quote

Photos first, or the gear on the bench. Nothing starts until you approve the price.

Twelve months on our workmanship

If the work we did fails, it comes back and we redo it at no charge.

A drop-off point near you

Named in your quote and matched to your location, or a prepaid label to your door across BE, NL and LU.